The Company
Qatar
National Cement Co is a major producer of Ordinary Portland Cement,
Sulphate Resistant Cement, Hydrated Lime, Calcined lime and Washed Sand
in State of Qatar. The manufacturing units of company are situated at Umm
Bab, close to rich raw material deposits,82 KM away from the Doha, the western coast of Qatar and Al-Boaadiat for the
washed sand.
|
|
Brief History
Qatar
National Cement Co. was established as per the Emiri Decree No.07 in 1965
to produce Ordinary Portland Cement in sufficient quantity to meet the
demand of cement in the State of Qatar.
|
|
First 100,000 tons line in year 1969
Commercial
production from the line erected and commissioned by M/s. Franco Tosi of
Itlay based on Semi Dry Process with capacity of 100,000 tpa started on 1st May 1969.
|
|
Second and third Production Lines in 1974 and 1976
With growing cement
demand in the State of Qatar, another production line of 100,000 tpa
capacity was installed in 1974 by M/s Tarmac (UK) & by M/s. FLS (UK).
However, as cement demand was still rising a third Kiln of 100,000 tpa
capacity based on same technology was erected in 1976 by M/s Buhler Miag,
Germany making combined clinker production capacity of the Plant more
than 300,000 tpa producing both the OPC and SRC Cement.
|
|
Calcined Lime Plant in 1978 & Hydrated Lime Plant
in 1985
Finding the
synergy with the existing activities and keeping in view the demand of
the growing industrial sector in State of Qatar , in steel in particular,
company proceeded with Calcined Lime Plant of 100 tpd in the year 1978
consisting of a Rotary Kiln with Planetary Cooler and other supporting
facilities.Hydrated Lime Plant was added to existing facility in 1985
with a capacity of 240 tpd .
|
|
Plant
2 in year 1998
With
a view to keep pace with growth of nation, a most modern and separate
Cement Plant of 2000 tpd clinker production was commissioned in 1998
, at the site closer to the Plant 1.The New plant was supplied and
erected by M/s.FCB (France) on turn key basis with M/s.Holderbank
(Switzerland) as the consultant.
|

|

|
The
foundation stone of the project was laid by H.E Abdalla Bin Hamad
Alatia (Minster of Energy & Industry) on 12th Nov 1995 and inauguration of the
plant was done by H.H Shiekh Hammad Bin Khalifa Al-Thani (Emir of the
State of Qatar) on 10th Feb 1998.
|
Plant
3 in year 2007
|
In April 2004, a contract for constructing
Plant 3 with a capacity of 4000 t.p.d. clinker was awarded to M/s FCB
Ciment (France) on turn key basis with M/s Basse Sambre of Belgium
as consultant at site next to Plant No. 2.
|
|

|

|
|
The foundation stone laying ceremony was
completed by His Highness Sheikh Tamim Bin Hamad Al Thani, The Heir
Apparent on 20th
December 2004. The construction of
Plant No. 3 was completed in Jan 2007.
|
|
|
In continuation to the company's support of
the construction development in the country a contract for constructing
Plant No. 4 with the capacity of 5000 TPD clinker was signed with M/s
FCB Ciment (France) as contractor and M/s Basse Sambre (Belgium) as
consultant engineers alongside Plant No. 2 & 3. The Two Mills of
Plant No. 4 became operational in May & July 2008 and full plant
was commissioned in July 2009.
|
|

|
With this the total cement production
capacity is increased to 15,500 t.p.d. and clinker production capacity
is increased to 11,900 t.p.d.
|
|
|
The capacity of the washed sand plant.
Which was purchased in January 2003 from the Ministry of Municipality
and Agriculture Affairs, was doubled to 20,000 t.p.d. by rehabilitating
the Plant.

The company also established new washed
Sand Plant No. 2 in December 2008 with a designed capacity of 20,000
t.p.d. through a turn key contract awarded to M/s CDE Ireland of
Ireland.
|